China — Global Center of Building Materials & Interior Manufacturing
| Save Money · Save Time · Door to Door · Butler Service
Verified

Contrôle qualité strict (QC)

Quatre étapes documentées avant expédition : contrôle de l'humidité, tolérances CNC 5 axes, inspection complète du prototype à 100 % et caisses export testées en chute.

By NEXA Engineering··2 min read·Updated October 19, 2026
Contrôle qualité strict (QC)

Zero tolerance for defects before the container closes

Every NEXA order passes strict on-site laser dimension checks, surface inspections and drop-tested export wooden crating. Full pre-shipment inspection produces detailed photo and video reports issued to the client for approval before shipment.

Raw materials are verified against batch certificates, conditioned to 8-12% moisture content and dry-fit assembled. Machining is held within +/-0.5mm with 100% dry fit verification prior to container stuffing, and components are wrapped in PE foam, protected by rigid corner guards and sealed in fumigated ISPM-15 plywood crates with heavy-duty desiccants.

  • 4K live video streams during full mockup inspection.
  • Fire, formaldehyde and hardware-cycle documentation per batch.
  • Photo-verified container stuffing and loading plan.

The four-stage pre-shipment gate

Documented at every step, reported to you

Moisture & Kiln Control

Timber and veneers conditioned in thermo-hygrometric chambers to 8-12% moisture content to prevent cracking in transit.

CNC 5-Axis Precision

Computer-controlled routing of tenons, mortises and hinge drillings with sub-millimetre accuracy for effortless jobsite fit.

100% Full Mockup Inspection

Complete room sets fully erected in our testing studio - gaps, drawer glide, wiring and load capacity checked on 4K video live stream.

Export Crating & Desiccant

PE foam wrap, rigid corner guards and fumigated ISPM-15 plywood crates with heavy-duty desiccants for ocean freight.

Standards & test benchmarks

SpecificationValue
Fire classificationASTM E84 Class A (US) / EN 13501-1 Class B-s1, d0 (EU)
FormaldehydeE0 grade / CARB Phase 2 / US EPA TSCA Title VI
Hardware cyclesDTC / Blum hinges tested to 100,000+ cycles (EN 15338 Level 3)
Machining toleranceLaser CNC within +/-0.5mm; 100% dry fit (DIN 68874-1)
Packaging transitISTA 3A drop & vibration standard; ISPM-15 fumigated crating
Batch documentationMaterial certificates, moisture records and photo / video inspection reports

QC proof points

100%
Full mockup inspection
+/-0.5mm
CNC machining tolerance
+3%
Spare hardware buffer
4K
Live video sign-off

Inspection FAQ

Can we send a third-party inspector?
Yes - we host SGS, BV and TUV inspectors at the factory at any time, and every gate produces photo and video records you can review remotely.
How long does a full container inspection take?
Typically 2-3 working days for a full container load, including the mockup walk-through and crating check.
What happens if an item fails QC?
The item is reworked or remade before crating. Nothing leaves the workshop without a signed gate record and client approval of the inspection report.
quality control pre-shipment inspection astm e84 iso 9001 mockup crating

Related Solutions