China — Global Center of Building Materials & Interior Manufacturing
| Save Money · Save Time · Door to Door · Butler Service
Process

Quality Assurance & Certifications

Documented three-stage inspection: materials, fabrication and container loading.

By NEXA Quality Office··1 min read·Updated October 19, 2026
Quality Assurance & Certifications

Three-stage quality gate

Raw-material verification, in-line CNC tolerance checks and a full pre-assembly trial fit. Each stage produces a signed report that travels with the container.

  • ISO 9001 / CE / ASTM-E84 documentation
  • Moisture and formaldehyde testing per batch
  • Photo-verified container stuffing

What we verify

Documented at every step

Materials

Batch certificates, moisture content and colour matching.

Fabrication

CNC tolerance, edge banding and hardware pull tests.

Logistics

Crating, container loading plan and photo evidence.

Inspection FAQ

Can we send a third-party inspector?
Yes - we host SGS/BV/TUV inspectors at the factory at any time.
How long does inspection take?
Typically 2-3 working days for a full container load.

Related Reading